How Much Does Dry Ice Blasting Cost?
Dry ice blasting is priced by the project, not by the square foot. Here are the variables that drive the number — and how to get a useful estimate fast.
There is no single per-hour or per-square-foot price for dry ice blasting. Cost depends on the scope of work, the contaminant, the equipment, access, location, dry ice consumption, compressor needs, safety requirements, and schedule. The honest answer is that two jobs that look identical from across a parking lot can price 3× apart once you walk up to them.
The big cost drivers
- Project size and access — confined space, elevation, scaffolding needs.
- Contaminant type and thickness — light dust vs baked-on carbon.
- Substrate sensitivity — energized switchgear vs structural steel.
- Dry ice usage rate — typical jobs consume 200–1,000 lb per shift.
- Compressor and power needs — 375–1600 cfm diesel air at 80–250 psi.
- Safety, PPE, confined space, hot work, and LOTO requirements.
- Travel, lodging, and per diem for multi-day crews.
- Schedule — planned outage, scheduled maintenance, or true emergency.
- Number of operators and shift pattern.
What you can do to lower cost
- Bundle multiple pieces of equipment into one mobilization.
- Schedule in advance — emergency premiums add up fast.
- Provide compressed air and power on site if you have spare capacity.
- Send photos and a brief scope before the walkthrough.
- Combine cleaning with planned outages instead of standalone visits.
How estimates actually get built
A useful estimate starts with a 10-minute call, a few photos, and a realistic schedule. From there we can usually produce a written quote within one business day. For larger scopes (HRSGs, refineries, multi-line food plants), we do a no-charge site walkthrough.
Getting a fast estimate
Call (866) 648-0030 or request a quote. A short conversation about your equipment, photos of the contamination, and a realistic schedule is usually enough for us to provide a clear estimate.
Related Articles
How Much Dry Ice Does a Cleaning Job Use? Consumption Math That Holds Up
Pellet consumption drives both your cost and your schedule. Here are realistic feed rates by application, plus how to estimate total pounds before the crew mobilizes.
Read articleHow to Hire a Dry Ice Blasting Contractor: 12 Questions to Ask
Anyone can rent a machine. Here is how to tell an experienced industrial contractor from a rental operator before you let them near your equipment.
Read articleThe ROI of Dry Ice Blasting: How to Build the Business Case
The hourly rate is never the story. Build the case on downtime avoided, teardown eliminated, disposal removed, and asset life extended — with the arithmetic to back it.
Read article